| Screeding a bedding layer |
|
|
|
Introduction |
|
|
Screeding is a method of constructing a well profiled bedding layer that flags or bricks or any other, regular thickness pavings can be directly laid onto with no further levelling. A screeded bed is typically established approximately 5-10mm high, and the pavings then compacted down to the required level.
For example, when laying 35mm thick flags, the screed level will be established at 27-30mm below finished paving level, leaving the paving 5-8mm high which is then tapped down to the correct level. For 60mm thick block paviors, the bedding layer will be established at 50-53mm below finished paving layer, resulting in the blocks being 7-10mm 'proud' to accommodate final compaction with a vibrating plate compactor. |
|
| It is not possible to state definitive values for how much a given thickness of bedding material will consolidate, as different materials compact to different degrees. Also, total bed thickness affects this 'compaction fraction', as does moisture content and other factors such as grain size, the strength of the laying operative, the weight of the maul, the size of the plate compactor, the type of paving being laid, etc. | |
|
Other Calculators |
Click here for a pop-up calculator that calculates the quantity of grit sand required to cover a known area at any given thickness. |
|
|
|
PrinciplesBS 7533 Part 3 (2005 Ed.) describes two alternative methods of preparing a screeded laying course:
|
|
Pre-compactedThis is our preferred method, the one we have found to give fewest problems with settlement, and the easiest to undertake on site. The laying sand is spread in one layer, lightly compacted with only one or (at most) two passes of the vibrating plate, then screeded to a level that allows for final compaction of the paving units down to finished level. This process is described in more detail below. |
|
UncompactedThe laying course material is spread and screeded to level. The thickness of the bed is determined (by extensive and time-consuming trial and error) to give the required bed thickness once the blocks have been laid and the lot compacted. |
|
| Just why anyone would use this method is beyond us. It is a nightmare! It rarely, if ever, gives a good finish; it takes at least an hour to determine just what thickness of uncompacted sand is needed to give a bed of regular thickness; it cannot compensate for deviations in the level of the base or sub-base; the sand, as mentioned in the description of the partial compaction method, varies from spot to spot. |
|
| The only occasions when an uncompacted laying course has been successful is when it is laid by a paver machine over an accurately profiled sub-base or base, as happens with some machine-laid installations. Because the laying course material is evenly distributed by the machine, over an accurate sub-base (or base) and is not trafficked by operatives during its placement and screeding, a reasonably accurate bed is achieved. On manually prepared beds, the risk of creating differential compaction due to uneven distribution, or the material being walked over by operatives is too great, and therefore we cannot recommend this method of laying course preparation for hand-laid paving. | |
|
|
|
Partially compactedIn earlier editions of BS7533:3, a third method of screed preparation was described but has been dropped from the latest (2005) edition because it is so bloody unreliable. However, a number of contractors (who really ought to know better) still use this method, so it is described below for reasons of completeness. Anyone using this method is most strongly advised to update their knowledge and switch to the much more reliable 'pre-compacted' method described above.The laying course material is spread and levelled to the required depth below the finished paving level, and compacted. A further 15mm or so of loose laying course material is then spread over the first layer, and screeded to level. The paving units are laid directly onto this uncompacted layer. |
|
| The major drawback with this method is that the laying gang have to work the area twice: once for the compacted layer and once for the loose layer, whereas the pre-compacted method enables a bed to be prepared in one. |
|
| Also, we find that the loose layer compacts differently, depending on moisture content and grain density. One patch at 15mm thick may compact to, say, 9mm, but an adjacent patch that may be slightly damper, or more compact, will consolidate to, say, 12mm thick. | |
The Tools... for contractors |
|
|
Contractors are required to prepare screeded laying courses more or less every day, and so they tend to rely on specialist screeding aids which would probably be beyond the budget of most diy'ers, as they are not a tool they are likely to use time and time again.
Probst Handling Ltd. manufacture an unrivalled range of high-quality screeding tools, including the EP System, which comes in a range of sizes from 700mm wide for "touching-up" jobs and smaller areas, up to the 2500mm wide model shown opposite which is designed for larger areas. |
|
|
These tools are specifically designed for manual screeding, and can be adjusted to ride on top of screed rails, as shown above, or along the top surface of a kerb, edging or soldier course, as shown opposite, so one tool can be used in almost every situation.
They benefit from carefully considered features, such as the cross-shaped handle that makes dragging the tool that much easier, and they are operated from an upright position, thereby eliminating one of the curses of the trade, Screeder's Knee, a dull ache in the joint brought on by extended kneeling in damp sand. |
|
Hinged or jointed screeding bars, as shown on the right, are a handy piece of kit for those gangs undertaking a lot of cambered or dished work. The centre joint can be set to a variety of angles to accommodate raised profiles (roof-section or cambered), or dished (pan-section) profiles as the job warrants.
While such a tool is ideal for constant width pavements, it is sometimes quicker to use a standard straight screeding tool with screed rails to create more complex cambers and dishes. |
|
|
For larger jobs, a machine-mounted screeding bar or bucket, such as that on the left, is often preferred, as it allows one operator to prepare a considerable area in a relatively short time, increasing productivity of the laying gang. They also tend to be significantly bigger than the manually operated versions, up to 7 metres in length. However, such a system needs to have the room to manoeuvre or they can be more trouble than they are worth. They are better suited to car parks, commercial yards and freight-handling areas, rather than residential driveways.
Again, some time needs to be spent establishing trammel bars or edgings to guide the screed board, and there will probably be some sections that will still require manual screeding or titivating with a bull-float, but these systems do provide a valuable service on large pavements. |
... for smaller jobs and diy |
|
| The purpose-designed screeders are all well and good for us professionals, but for most diy projects or smaller jobs, a straight-edged length of timber is easier to manipulate, and much more cost-effective. 100x19mm is a good sized board to work with, and the timber should not be more than 3m in length, as longer lengths can be hard to drag, single-handed, and are more prone to bending and sagging, leading to incorrect level formation. | ![]() |
Establishing screed depth - see table opposite It should be noted that the values given in Table 1 opposite assume a laying course thickness (ie, depth of sand) of between 40 mm and 50mm. You may find your sand gives slightly different results. Trial and error is the only way to establish an accurate value for each project. |
Table 1 |
Establishing screed rails/trammel barsWhere there is no kerb, edging or soldier course from which to work, a screed rail or trammel bar should be established in the bedding material at the required level as described below. See the table above for details on recommended screeding levels for various thicknesses of paving. |
|
Screed rail in position during laying process |
A screed rail is a long, straight rod or length of timber, usually 3 to 4.5 metres in length. All kinds of items are used as screed rails or trammel bars; 20mm diameter steel conduit is probably the most popular choice, as it's robust, re-usable and cheap, but aluminium I-beams or box section, roadform sections, or lengths of 75x50mm timber are all regularly used by Contractors throughout the land. As long as the chosen 'rail' is convenient, fairly smooth, and, most importantly, absolutely straight, almost anything can be used. |
| The screed rail is established within the bedding layer and set in such a way that its top surface is at the level required for the surface of the screeded bed. Some rails are simply bedded into the laying course material, while others may be set atop bricks or other padstones, or carried on steel pins. The most important factor is that, once established, the rail should not move, settle or sag when the screed board is dragged over it, yet must be capable of being removed prior to laying of the paving course. |
|
| The level of the screed rail is determined by the compactibility of the laying course material and the thickness of the chosen paving. Table 1 above gives some average values for a typical zone 2 sand bed at 50mm thickness, but other sands or other bed thicknesses may yield different results. Only on-site trials can determine the actual compaction values for each project, and therefore this must be determined before a screeded bedding layer can be prepared. This is normally achieved by constructing a small area of paving, relying on experience to 'guesstimate' the screeded bed level, and then checking that final compaction of the paved surface hammers down the paving units to the desired level. If the paving units refuse to settle down to the required level, or finish up lower than the required level, the screeded bed level must be adjusted up or down accordingly. Remember that for most segmental paving, such as blocks or flags, the finished paving level should be within ± 3mm of the desired level, so there is some leeway. | |
|
The level of the screeded bed has been determined and therefore the screed rails can now be established. These are typically positioned in such a way that the screed board will span from rail to rail or edging to rail, with some overlap, usually 100-300mm, and are always aligned in the direction in which the screeding action will take place. |
|
Once the rails are in position and aligned, their level is set by checking against a taut string line stretched between two known level points, by using boning rods, or by means of an automatic level. It is essential that the rails are firmly established - should they move after establishment, the whole screeded bed could be at an incorrect level which in turn, could result in the finished pavement needing to be re-laid. |
Cambers and dishesNote that it is possible to create cambered or dished profiles with the aid of screed rails. By establishing the rails above or below the intermediate level determined by stretching a taut string line between to known points, as illustrated above, a camber or dish of known proportions can be created. On larger pavements, a series of rails can be established to create a dish or camber with a span of 10 metres or more.For cambered profiles, the screed rail is often established at an apex which is subsequently smoothed off by screeding with a shorter screeder board or a bull float. In some instances, a pair of rails is used, as illustrated opposite. Dished profiles are constructed using a similar process where the rounded dish profile is created by manually re-screeding with a short, straight screed board or bull-float, although some contractors use a specially shaped screeder board to create the dish. |
|
The screeding processOnce any necessary screed rails are positioned, the screeding itself can be done. The screeder board is dragged in one direction, making sure the bottom edge of the notches, or the bottom edges of the screeder board are kept in contact with the top of the rail or edging at all times.Short screeder boards can usually be managed by a single operative, but larger boards are best used by two operatives, one at each end. Often, a gentle transverse (side-to-side) sawing motion of the screeder board will help its accurate passage through the bedding layer material, scraping off the excess sand as it moves along. Should the weight of scraped-off bedding material in front of the screeder board become excessive, it can be carefully removed with a trowel or spade and moved out of the working area, thereby reducing the 'weight' at the front of the board to a manageable amount. When removing surplus sand, care needs to be taken in order not to disturb the compacted material beneath the screeder,. And the Golden Rule of preparing a screed: DO NOT traffic the area that has been screeded, not even to just walk across it to get a trowel. This can cause differential compaction, and problems with finished paving levels. |
|
|
|
Final titivatingWith straightforward screeded bedding layers, once the screed has been prepared, the paving can be laid, but with most projects, some 'tidying-up' work or 'titivating' is necessary to complete the preparation.When an edging or soldier course has been used to guide a screeder board, there is often a surplus of bedding material alongside the soldier. This can be re-screeded with a short screeder board or simply removed with a bull-float or trowel. The same is true for 'obstructions' within a screeded area, such as manholes, gullies, lighting columns, bollards etc. If possible, it's best to undertake this tittivation as the screeding progresses, to avoid having to walk across the screeded bedding layer once complete. |
|
| However, there is one item of titivation that can only be done by walking on the screeded area - removal of the screed rails and filling-in of the hollow they leave behind. In practice, this is done with minimal disturbance to the screeded bed, by carefully lifting out the rails and moving them out of the working area, and then walking, one foot in front of the other, in the track of the removed rails to infill with bedding material, compact it underfoot, and then screed out with a short screeder board or bull-float, working backwards out of the screeded area. |
|
|
The final bit of titivating is to visually check the screed. This may involve lying flat on the ground, getting the eye as close to screed level as is possible and checking for humps and hollows. Any defects in the screeded bedding course should be corrected at this stage, before they impinge upon the pavement itself. Some of the long-handled screeder boards allow lumps and bumps to be rectified without stepping onto the screeded area, but in other areas, there may be no viable alternative other than to send an operative onto the screeded bed to rectify a defect. In such cases, the operative should endeavour to make a single track onto and out of the screeded area. Once the necessary rectification is complete, the operative should work backwards, off the screeded bed, levelling out footprints and other disturbance in their wake.
Once an area is prepared in this way, the pavers or flags can be laid directly onto the screeded bed. Work should always be carried out from the paved area, not from the screeded bed, with tools and materials moved along as work progresses. |
|
| Many thanks to Neil Jones of Probst Handling Equipment in Wem, Shropshire, for granting us permission to use his publicity photographs to help illustrate the more technical points of this page. |