Topic: Continuing herringbone pattern< Next Oldest | Next Newest >
ALAM
Offline

Apprentice




Group: Members
Posts: 1
Joined: Nov. 2019
Posted: 19 Nov. 2019,22:13 QUOTE

Hi, I have laid a 45 degree herringbone in standard block. I've come to a slot drain, and can't seem to work out how to best carry on the paving the other side, whilst trying to keep the pattern uniform with what's laid

--------------
Zamir alam
Back to top
Profile Personal Message 
Tony McC
Offline

Site Agent




Group: Moderator
Posts: 11042
Joined: July 2004
Posted: 20 Nov. 2019,13:53 QUOTE

Firstly, is it essential to maintain the pattern? Could you not start again with the herringbone on the other side of the slot drain?


If the pattern and alignment *must* be maintained, then the way to do it is to use taut string lines from the existing stretched over the new artea to be paved. This gives you the angle and alignment.

The second part is to maintain the spacing, to give the impression that the slot drain has been inserted into a pre-existing panel of blocks. Two ways to do thios: either use acutal blocks propped up on sand or other bits of blocks to form a bridge over the slot drain, and then, once clear of the drain, start again with conventional laying, or, the alternative, is to measure the distance and mark it as necessary.

Let's assume you will be missing 3 courses of blocks to accommodate the slot drain. On the existing paving, you measure three courses and find that, allowing for the jointing, it's 406mm. Simply measure 406mm from the last full block of the existing paving, again bridging over the slot drain, mark the position, and start to lay full blocks again.

Once you have a reasonable area of full blocks laid, you can drop back and start to cut-in against the slot drain, once you've checked that the spacing and alignment looks right.

Does that make sense?


--------------
Site Agent - Pavingexpert
Back to top
Profile Personal Message WEB 
1 replies since 19 Nov. 2019,22:13 < Next Oldest | Next Newest >

[ Track this topic :: Email this topic :: Print this topic ]

 
reply to topic start new topic
Quick Reply: Continuing herringbone pattern

Do you wish to enable your signature for this post?
Do you wish to enable emoticons for this post?
Track this topic
View All Emoticons
View iB Code


ruler

ruler